Albert-Einstein-Straße 1, 49076 Osnabrück, Germany +49 541 959 88 44 0 info@imp24.de
imp ingenieurgesellschaft mbh Request list

Company

References & industries

Selected projects and the industries we are at home in.

Industries

Our customers and suppliers come from these industries.

Automotive & mobility

OEM, Tier 1 and Tier 2: interior, powertrain, chassis, body, electric vehicle technology, commercial vehicles.

Foundries & forges

Decades of practice in materials technology, quality assurance and sales of cast and forged parts.

Aerospace & defence

Materials consulting and quality assurance to the standards of the industry.

Mechanical & plant engineering, automation

Automation, precision manufacturing, CE marking and technical documentation.

Electroplating & surface technology

Measurement and control technology for pH, redox and conductivity, ampere-hour meters, coating thickness measurement.

Electronics manufacturing

Cleaning systems for printed circuit boards and accompanying test equipment.

Selected projects

IMP is part of the apc group. The following relocation, quality and supplier projects were carried out by teams of the group – without customer names for reasons of confidentiality.

Automotive · Interior

Relocation of plastic, aluminium and carbon interior parts during series launch

ChallengeRelocation of series production to a new site in the middle of launch – without access to the previous supplier’s tools, in just 6 months.

SolutionInterdisciplinary relocation team on site, rebuilding of tools and fixtures based on component and specification, audits to VDA 6.3, full sampling/PPAP.

6 monthsFull security of supplyVDA 6.3 / PPAP
Automotive · Chassis

Production relocation with optimisation of the value chain for controlled dampers

ChallengeCreating transparency on costs, quality and risks across the entire supply chain and actively optimising cost structures.

SolutionIntegrated supplier management, best-cost-country sourcing, make-or-buy analyses; relocations to Italy, North Africa and the Czech Republic.

Second supplier establishedRobust business caseZero-defect strategy
Automotive · Body

Relocation of sheet metal processing & cathodic dip coating during running series production

ChallengeTransfer of approx. 39 tools and welding fixtures for approx. 150 components – with documentation missing.

SolutionComplete tool documentation and inventory, condition check, 8D-driven quality assurance at the new supplier.

~150 componentsNo line stoppage8D & sample approval
Automotive · Reshoring

Reshoring of carburettor bridge production to Europe

ChallengeReshoring from a low-cost country while OEM deliveries continued – in parallel with the industrialisation of the successor model.

SolutionProcess and tool transfer, requalification to IATF 16949, in-house automatic assembly machines, soldering technology and series test equipment.

0 days of line stoppageIATF 16949Lower logistics CO₂
Automotive · Automation

Relocation of a complex interlinked assembly and test line

Challenge17 s cycle time, approx. 850,000 units per year, 98% availability and automatic changeover between 9 screw sizes.

SolutionDesign of the screwdriving and assembly stations, set-up and machine capability study at the manufacturer, relocation, recommissioning and final acceptance over ≥ 10 shifts.

Cmk ≥ 1.67Cpk ≥ 1.3398% availability
Automotive · Complete vehicle

Development project management & supplier management for interiors

ChallengeVery short development times in the complete-vehicle project (18 months) and brand-specific cockpit adaptations.

SolutionRecovery and escalation management, management of the A-suppliers, make-or-buy decisions, relocation of injection-moulded plastic parts during launch.

18 monthsA-suppliersRecovery management
Automotive · Powertrain

Assembly planning and time management for the final assembly of an 8-speed automatic transmission

ChallengeReliable planned times and line balancing across 15 main workstations with a high number of variants.

SolutionWork content and time analysis per station, RFID workpiece carrier control, multi-spindle screwdrivers, poka-yoke and test concept.

120 s cycle time15 main workstationsComplete traceability
Automotive · German OEM

Relocation & integration of equipment and model series – from concept to SOP

ChallengeIntegration of new model series into running production without downtime, on schedule and on budget up to start of production.

SolutionAs-is analysis, digital factory, robot simulation, layout and logistics planning, launch support including CE and acceptance.

Zero downtimeDigital twinAcceptance at SOP

Further references gladly on request

Our related services

Advanced quality planning, audits, supplier development and SalesPLUS for foreign suppliers – from a single source.